|
Google Site Search | Get RDSS | Sartin Library | RDSS FAQs | Conduct | Register | Site FAQ | Members List | Today's Posts | Search |
RDSS Racing Decision Support System – The Modern Sartin Methodology |
|
Thread Tools | Display Modes |
02-25-2007, 11:09 AM | #1 |
Administrator
Join Date: Jun 2005
Posts: 2,643
|
SR questions
Hi Ted
I just am still having problems. I made this screen capture of RDSS original lines , Adjusted lines The readouts from The DRF and then the lines typed into VALM then the adjustments that program is making Ok here goes .. I use the original lines to pick the best of the last 3 speed rating plus TV For this horse # 3 Count Montbrook from todays first race at Philly I see a 90 SR and a 2 variant So in my head I think 90 + 2 = 92 DRF or HDRF gives Count a 88 sr and a 21 TV Now I thought that Doc and pirco used to use 17 18 19 as no adjustment and then 1/2 for each number over 19 so I would add thought that a 21 varient meant that the track was two ticks slower than normal Is this why you give # 3 a 90 SR because the drf gave it a 88 plus the 2 tick adjustment? I then show the adjusted lines screen and you show the original speed rating then the adjusted number, I think because of the distance the 90 becomes 84 Then I entered # 3's lines into VALM and Valm adjust down to 83 83 so thats cool What I'm thinking is I should not add the SR- TV together I should just use it as a guide to how slow or fast the track was. When you show a negative number does it mean that the track was faster than the normal 17 ,18,19 Thanks Bill |
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Energy Program Questions | Houndog | Velocity Programs | 23 | 05-19-2006 11:24 PM |
Questions About the Kentucky Derby | Turbulator | Speculator | 7 | 05-06-2006 12:30 PM |