Jim
The topic of this thread as I understand it was that Syn 2 was best used as
in the manual
There are a few parts of syn 2 that need some hand input
First is the question about shippers.
Next is the track record or 3 year best time.
Last is the set up times .
This test is to see if doing these vital steps makes a difference
over just sending adjusted data from RDSS
I am doing this because If the test holds up I believe as Shoe pointed out
Doing all the seps will out preform just sending the adjusted numbers
from RDSS. If this holds up and is the case , Then Ted will have a valid reason to invest his time into working a way that the set up time, shipper and 3 year best- track record can also be
auto entered.
A problem with testing the readouts from 2 different methods is there are quite a few readouts to compare on SYN 2
For the test I will just go with the top 2 FW and the top 2 DR
so far Jeff's suggested method is 4 for 4
GS
Bill
|