let me add
Or is shape trying to say that a shape of +6 at call 1 means that the leader is on pace to FINISH 1 sec faster than par?
If that's the case, I refer back to their faq:
“This enables the user to quickly identify which segment(s) of the race were fastest and slowest (relative to each call's average pace for the final time).”
Specifically states relative to EACH calls average pace.
Thanks.
Bob
|